This month brought several significant changes to the space. The steel work for the north elevator shaft is nearly complete. The new electrical switchgear is being set. Steel platforms are being built and gas lines run to the roof for the new HVAC units that are en route to The Rabbit hOle right now! Window openings are being prepared for installation and glazing. Concrete for the patio on the east side of the building is being poured. And three mega-holes were cut into the first and second floors of the building: 


One that will connect the two floors of the Explor-a-Storium via a grand staircase; One that will connect Fox Rabbit’s burrow to the main floor of the Explor-a-Storium; And an expansive cut at the front of the building near the entryway that will reveal a magical grotto and passageway below the floor into the world of Fox Rabbit.

Dramatic changes indeed!







0 views

ADDRESS
not open to the public...yet!


919 East 14th Ave.

North Kansas City

Missouri | 64116

CONTACT

 

studio@rabbitholekc.org

816 - 492 -7915